"Soil" sub report using Results> Output Report in AutoPIPE


Comments, Questions, and Answers

  1. How does AutoPIPE calculates slippage length and virtual anchor length between 09.06.01.11 and 09.06.00.19.?
  2. Why is there a difference between the "Soil" displacement values and the "Displacement" reported values?
  3. Why K1 soil value for longitudinal direction does not match hand calculations?

See Also

Analysis Sub-reports FAQ

Bentley AutoPIPE