Applies To | |||
Product(s): | STAAD Advanced Concrete Design | ||
Version(s): | Connect Edition | ||
Environment: | |||
Area: | Concrete Design | ||
Subarea: | Slab Design | ||
Original Author: | Abhisek Mandal, Bentley Technical Support Group | ||
RCDC design the two-way slab individually. However, when I have provided same bottom reinforcement to adjacent slab it doesn’t show the continuous reinforcement in in-plan detailing drawing.
RCDC generate In-plan detailing and BBS drawings for the top and bottom reinforcement. In In-plan detailing, reinforcement shown are indicative and for the individual panel. even if the reinforcement is same at bottom for adjacent slabs, it shows separate reinforcement. it doesn't show any lapping and end anchorages in the drawing. In BBS drawings, user can provide the maximum length of the rebar for individual panels. Here the rebars are shown for individual panels. It would be complex showing continuous rebars wherever possible as per the maximum length of rebar and as per the spans of adjacent slabs with end conditions .Thus for BBS, the bottom reinforcement are shown for individual panels only