In RM Bridge Enterprise > Analyzer, were defined the several Construction Stages considered in the bridge built and until the composite is activate (before concrete slab is hardened). Presented below the different construction stages calculated.  

STG01 – Infrastructure

STG02 – Steel Beams

STG03 – Stiffeners

STG04 – Cross Frames

STG05 – Abutment Diaphragms

STG06 – Wet Concrete

In the next video is presented how to introduce load cases, consider the creep and shrinkage effects, define construction stages and schedule actions, and how to look at results in the Main View.