Getting "Beam Corridor is required" message when trying to place bearings.


Issue:  Why an I getting a "Beam Corridor is required" message when trying to place bearings?

Resolution:  One gets this error when trying to place bearings without doing a Beam Layout and Place Beams.  When working in a Beam Slab (P/S or RC Concrete Girder) or a Beam Slab (Steel Girders) bridge one has to do a Beam Layout and then place the Beams before placing bearings.  When working with RC Slab or CIP Concrete Box or a Segmental bridge one can place bearings without beam layout (and beams).