South Toulon Tube: Numerical Back-analysis of In-situ Measurements


Application PLAXIS 3D
Version PLAXIS 3D
Original Author J.P. Janin, A. Guilloux, H. Le Bissonnais, R. Kastner, F. Emeriault
Date created 25 June 2013
Date modified 24 October 2016

Full face excavation with ground reinforcement has become a common technique to build large tunnels in soft rock or hard soil. Nevertheless, at the design phase, it remains difficult to assess the effect of the different construction and reinforcement elements on the control of the ground movements and settlements. In order to improve the understanding of ground response to this tunnelling method, a monitoring section has been installed during the construction of the south Toulon tunnel (France). An important database was obtained and subsequently used for numerical back-analysis. A 3D FE calculation (PLAXIS 3D v.2010), modeling the real pre-reinforcements system and workflow steps, permitted to simulate the in situ measurements.

 

Downloads