Concrete dam with confined groundwater flow


Application PLAXIS 2D
PLAXIS 3D
Version PLAXIS 2D
PLAXIS 3D
Date created 10 January 2013
Date modified 10 January 2013

This document describes an example that has been used to verify the groundwater flow capabilities of PLAXIS. Concrete dams with three different underground construction strategies are considered: one without an impermeable screen, one with an impermeable screen at the upstream side and one with an impermeable screen at the downstream side.