PLAXIS 2D Tutorial 07: Dry excavation using a tie back wall


 

Application PLAXIS 2D
Version PLAXIS 2D CONNECT Edition V21.01
PLAXIS 2D 2024.1
PLAXIS 2D 2024.2
Date created 20 May 2017
Date modified 21 August 2024

This example involves the dry construction of an excavation. The excavation is supported by concrete diaphragm walls. The walls are tied back by prestressed ground anchors.
PLAXIS allows for a detailed modelling of this type of problem. It is demonstrated in this example how ground anchors are modelled and how prestressing is applied to the anchors. Moreover, the dry excavation involves a groundwater flow calculation to generate the new water pressure distribution. This aspect of the analysis is explained in detail.

This exercise requires a PLAXIS 2D Advanced or PLAXIS 2D Ultimate license.

The attached *.log file contains all the commands to generate the model. With a Bentley Geotechnical SELECT Entitlement [GSE] licence, you can use the commands runner to open the *.log file and to execute all commands in one go, see also this instruction.

 