Resolved issues in Promis.e CONNECT Update 7, 10.07.00.17


BUG/ ENHANCEMENT         DESCRIPTION

500362[Promise Installation] SQL Express 2016 with the installation package 
336592Command Protection: user needs Create WorkSpace & Workset, Copy Project and Move to Database function to be part of Command Protection
252394Part number text on two lines.
334343[Command Protection] It should not allow to create new database in New Project,Copy Project and Restore Project through Project Database Utility when turn OFF Configure Databases
445168[Component] Mirrored symbol attributes text coordinates need to be corrected 
473880[Copy Project] Copied Projects don't have Pending changes included 
444076[Diagonal wire] After replace the family, the diagonal wire connection command will be invalid
474736[Diagonal Wire] When drawing diagonal wire type between to wire potential no EDC dialog pops up
490881[Insert Macro] When a symbol attribute containing "(Inch Symbol) is used to create Macro, when the macro is inserted the Value " is changed
526223[Installer] SQL Database connection issues occur when Microsoft SQL Server 2014 Express (BENTLEYECAD) option is deselected during installation
517361[Multi Language MDB] Error: Could not use "; file already in use
421954[Part Number] It cannot display the correct part number position with the modified part number
420142[Part Number] It should add the Part Number right click menu for the top part number
420158[Part Number] It will move the Part Number position without changing anything in the Text Setting dialog
420573[Part Number] Multi part numbers cannot be dealt with properly in the Sample projects and old projects
421706[Part Number] The rotated symbols cannot display the correct position of multi part number
484335[Performance] Wiring Manger taking long time to open or not responding for database that has more then 2500 projects 
482958[PLC Generator] Issue with PLC Diagram creation for Project located on Network location 
443072[PW][Import Catalog]Connect with PW, import a catalog, the imported catalog cannot list in the catalog manager dialog in time after importing.
459428[Regional Setting] The decimal symbol cannot keep dot after setting it.
276493[RestoreProject] Cannot restore project by double-click a .Prj file of promise
524263[Seed Files] Split seed files for each product (Substation and Promise)
457100[Spare Terminal]: When adding Spare terminal for part number with decimal quantity the user gets Unhandled Error message 
532459[Symbol Text] editing multiline symbol text changes the attribute's original insertion point
474786[Wire Link] When placing wire link pair on wires with different potential the user doesn't get EDC check dialog  
322029Command Protection: Restore Project from Tools option allows user to restore project even if there is command protection restriction for Restore 
384236Diagonal Wire Connection insertion point visible in export to DWG when the level is turned off
366104Disabling of Selecting WorkSpace and WorkSet not working with Promis.e but works in Promis.e Microstation mode
283215Display of page is not perviewed in Project manager if we scroll through keyboard
444046Promise Connect:- Wire layer is not getting display after certain limits
473770Symbol text appears on Parent child when value added to child symbol which contains ^ in value for symbol attribute which is hidden
450416TLS 1.2: User cannot create Parts Database Path for parts database on SQL Server using only TLS 1.2 settings
283645[Balloons] Place Balloons tool needs to work in construction drawings
455771Substation Workflow configuration— Support fasten the customized workflow in the Menu bar
473609[BOM Manager] add capability to allow user to reserve balloon numbers (add spares)
482542[PW Integration]Add new column "CheckedOut By" in Project Manager and synchronize the documents status in Project Manager with ProjectWise Explorer
499473Add the spare part out of the balloon range
502039[BOM Manager][Nameplate] improve message when user renumbers nameplate balloons if balloon is already associated to a different item on same BOM Document Number
502058[BOM Manager][Nameplate] allow user to renumber balloon if duplicate balloons are part of selection set being renumbered
504143[BOM Manager][Wire Link ID's] exclude all wire links from BOM Manager data grid
505125We should disable Insert Spare command when data is loaded using “By Work Order” option in BOM Manager dialog
230870Bentley Substation : Cable trench are extending beyond given point
231503[Insert Substation Objects]Insert Clamp with Cable method, it cannot work correctly if changing the Method in the Placement settings dialog.
236241Cut behaves like Extend for Repeating part types
312217[Martian] Some fields are translated and some are not translated in BOM Manager -> Customization 
312257[Martin]There is a duplicate “Material” in the drop down list, and the Show All is not translated. 
317970[Place 3D Macro] The icon should be updated to the new one in the Assign Device Tags dialog
365752[BOM Manager]Sometimes it popups error dialog when clicking the browse button of the part number.
381904[Balloon]The unselected balloon number is not changed if not selecting all the balloon numbers in the modify balloon dialog.
382399[Reference]Active a reference page and deactive it, open the original page, it always popup unexpected dialog.
387351[Submit to SAP] Unhandled exception occurs when submitted part does not belong to the active part database.
392541[BOM Manager] It reports error when assign balloon no to the part item in the BOM Manager
393300[BOM Manager][Report]Drag some data from Unassigned work order to an existed work order, the data cannot display in the report filter with the work order.
432980[Balloon]Select all the balloons->right click Move, move the balloons, it change the balloon arranges and returns to the original.
433408[Balloon] Delete the balloon number in the device properties dialog, the original balloon number still display in the drawing. 
434657[Documentation] The Mode Manager dialog in help file should be updated to new UI
435223[Submit BOM] Unhandled exception occurs when submitting BOM in the customized project “PIT #1 PH.Prj”.
438307Insert Cable / Bus :  The command reverts to default Phase level after placement of each cable segment 
439904[Hook Point Manager] It cannot pick a blank point coordinate from the drawing in the Hook Point Manager
440076[Project Manager]Error appears with modify page command in the Project Manager
440121Move Command: Changes the level of Cable attached to the Hook Equipment when using Hooked Objects in Move
440886[Balloon]Change the balloon number from “?” to an existed part number, the balloon in the drawing is not correct.
442337[Martian][BOM Manager] Some texts in BOM Manager are not localized.
444125[Project Manager][Page List] sort function not sorting records numerically or alphabetically for Ascending/Descending Sort functions
446234[PW_Restore] Fail to restore project with data from Conduit Builder tool to managed PW
449234[PW Integration] The page that opened from the PW Client side will be read only 
449245[PW Integration] Symbols cannot be found in the catalog when open the copied page
449326[PW Integration] Click Title block field reports error in the New page dialog with the restored project
450416TLS 1.2: User cannot create Parts Database Path for parts database on SQL Server using only TLS 1.2 settings
452268[BOM Manager] It should maintain the sort order after switch Group by Balloon to Device
452865[Insert Symbol][Recently Used] The user is not able to quickly switch between two different Recently Used symbols, Double Click selects incorrect symbol
453726[BOM Manager]BOM Manager->group by Device->Add Device with toggle of Create separate device per part turn off, and select a part number with quantity=2, two devices are created.
454192[BOM Manager] sort order not maintained when setting Group By to Device
455195[PW_WithCatalogsOnlyOnNetworkDrive]Modify catalog order in Modify catalog path dialog then its order cannot retain when open it next time
455418[Software Startup] Unhandled internal error on startup when invalid path format exists in Substation.cfg
455432[Software Startup] Application is frozen when invalid path exists in Substation.cfg if you clicks Cancel in Configuration Variables dialog.
457551[PW Integration][Project Manager] It will pop up check in dialog twice when close page in Project Manager 
459467[PW_NetworkCatalog] The defined network catalog is not available in Catalog Manager 
460046[Unhandled Error] Page Open error Type CDT.CdtCommandManager
460059[Project Manager]Incorrect Tool Tip Message
460066[Software Startup] Unhandled Error when DBSettings.xml is missing
460072[Software Startup] Unhandled Errors when required files are missing from Datasets\Substation\Config folder
460131[Software Startup] Unhandled internal error on startup when Substation.cfg is missing
460133[Software Startup] Configuration Variables not showing variable values which exist in Substation.cfg when one or more variables are missing
460136[Software Startup] Unhandled Error on startup when PartsDBMappings.xml is missing
460138[Insert Substation Objects][Placement Options][Cable Method] symbol does not properly follow contour of cable bus object is user applies rotation value in Angle field
460139[Move][Cable Method] symbol does not follow contour of cable/bus and unable to define new position properly
460140[Move][Cable Method] symbol's existing rotation value is not maintained if symbol was rotated using Rotate Object command
460143[Project Manager]Error occurs when project names with a suffix of space
462892[Stretch][Variable Object][Cable/Bus] Quantity not updated after user uses Stretch command
472011[Move][Cable Method] symbol's existing mirrored orientation is not maintained is symbol was mirrored using Mirror Object Command
473174Insert Cable: 3D Cables inserted in 3D layout mode with the Millimeters as units the cable is not inserted correctly 
473379[BOM Manager][Edit][Starting Balloon No] incorrect handling of balloon number assignment for devices without partnumbers
473623[BOM Manager] change device's partnumber for device with placed symbol removes part number and balloon values from device associated with placed symbol
473627[BOM Manager][Validation][Duplicate balloon number] not always showing all duplicates
473824[Load Work Order]It should display default “Activate Work Orders” in the Load Work Order dialog.
474386[Insert 3D Objects] Set variables in the Placement Options will not work properly 
475723[TLS1.2][Backup Project] An error occurs when backup project using only SQL Server TLS 1.2 settings
476000[Delete][Field]Installation and Location values not updating after user selects Yes to rename Installation/Location fields
476003[Delete][Field] Installation, Location, and Device Tag values disappear from Device Properties after user selects No to not duplicate device ID's
476703[Device Properties][Select Device ID] unexpected Device usage chart appears after selecting device ID on drawing
477174[PW integration][Project Manager]Check in dialog pops up twice 
478191[BOM Manager][Submit] Submit Flag not set when BOM is submitted to SAP
478396[Chinese Language Package on EN OS][Auto Backup]The projects which name or path contain Chinese characters can’t be auto backup.
478432[PW_Configuration Variables] Click PW browse to select the displayed cfg file for ELEC_PARTS_DB_MAPPING_PATH, an error appears
479016[BOM Manager][Edit][Starting Balloon No] unable to renumber Nameplate balloon number if Starting Balloon number less than or equal to highest balloon in project
479963[BOM Manager][Submit] field or fields not truncated properly
482210[Move To Database] incorrect message displayed when one or more pages of project are open
482751Update TP feature list in installer as we moved to PP U15.
483197[Catalog Manager] The Thumbnail is grayed out with ProjectWise Datasource
483586[Reports][BOM_Substation_QTY] missing report records when filtering by WorkOrder, BOM Document, Revision Number
483751[Alert Message] An unexpected Alert dialog occurs with multi functions in the new Substation build 10.09.01.07
488605[Performance] There is a memory leak issue in Insert Symbol dialog
488721[Display Style] Setting the Display style will crash 
488805[Update Cable object] The cable level will be changed to PHASE or CABLE_NAKED after update cable object
496389[Cable Object] It will change the decimals notation to scientific notation when update cable object
496648[Draw Cable] It cannot draw cable properly except the Spline sag algorithm with the MM seed file  
499586[BOM Manager] add a part from database in BOM Manager dialog, and then insert the object in the drawing by insert symbol by device id, the symbol lost the work order attributes.
500395[Reporting] An error occurs when running Text on drawing text on drawing and there is workorder filter in the report “BOM_Substation_Qty”.
502068[iModelHub]Cannot publish a project to iModelHub server because of PP U15.
502338[Reporting] An error occurs when running the report “Job Costing List – A4” or “Job Costing List – Letter” in the project “CATLETT SUBSTATION TRAINING.Prj”
506556[Copy Project][Work Order Manager] Work Order Manager will list duplicate work order in the copied project
511060[BOM Manager][Add Spare] Insert Balloon should never cause duplicate balloon numbers on same BOM Document(Insert Spare – Revision Level  and Insert Spare – Document Level).
511907[BOM Manager] Load lowercase and uppercase  BOM Document will report error in BOM Manager
515669[Replace/ Update Symbol] When a child symbol is modified and then replaced or updated in Project the connection points for child symbols are changed