Background

While generating isometric, the requirement is to combine the whole BOM with desired sequence of the components. Currently, Isometric BOM is created on the basis of Shop Material & Field Material. Now, if one can need to combine all the report without showing Shop & Field section, that can be also possible. Let's say, user needs a BOM in the sequence/pattern as shown

By default, isometrics manager gives the report as shown

In this wiki article, we will see how to combine the BOM & set the sequence as follows.

Steps to Accomplish

  1. Launch OpenPlant Modeler.
  2. Create a pipeline & place the desired arrangement.



  3. Generate the isometric with any desired style. Please follow the attached wiki article for how to generate iso

    WIKI >> how-to-generate-isometric-insession-outsession-in-connect-edition

  4. From IsoProcessor dialogue > click on Style configuration > select the desired style & click on Report Defiantion file as shown



    Note : one can manually access this file from the location C:\ProgramData\Bentley\OpenPlant CONNECT Edition\Configuration\Workspaces\123\WorkSets\1234\Standards\OpenPlant\Isometrics\styles\IFC\config

  5. Comment out few lines with "#" as shown. User needs to just add # sign.





  6. From the Isoprocessor dialogue shown in step-4, click on Style configuration Root as shown



  7. Open the Rep_sortgroup file.

  8. Now, set the sequence as shown
  9. Further Fittings also can be set in sequence if scrolled to the bottom of the same file as shown


    Note: One can set this sequence as well for the fittings group. For the moment Reducer > Flange > Elbow is our sequence.

  10. Save all the files & regenerate the isometric & verify the results as shown



    Notice that, the sequence is achieved as mentioned in Image-1 in description.

Note that, some issues is faced due to the sequence of the Supports in BOM. Please refer the below wiki article to resolve that problem

Wiki >> how-to-set-supports-at-last-in-sequence-in-bom-of-isometric

See Also

communities.bentley.com/.../how-to-disable-the-terminator-on-leader-line-in-isometrics-via-openplant-isometric-manager

Still a Problem?

If above problem still persists, then please create a Service Request and contact the Bentley Product Advantage group.  Please include a list of all relevant details to get in depth analysis for a solution or workaround