Application | GeoStudio |
Version | Latest version |
Primary Analysis | SIGMA/W |
Keywords | GeoStudio, SIGMA/W, Road Embankment, Excess Pore Pressure, Settlement |
This example is about constructing an embankment in delayed stages on a soft foundation so that some of the excess pore-water pressure is allowed to dissipate before subsequent lifts are placed. The soft foundation is modeled using the non-linear Modified Cam-Clay (MCC) constitutive relationship.