The removal of tubes in bundle layout can happen due to several reasons:
- Maintaining pass tolerance like we saw earlier this week the model that we worked on
- To maintain height between tubes with impingement baffle
- To maintain the TEMA inlet outlet condition requirement when ‘compute’ field in Bundle dialog box is checked to verify shell entrance and exit areas as per the TEMA calculations
![](43fac7f247f9c250e3378d53636d43be.iix)
If I remove the compute check option shown in above image
![](dbfa07761bf1c250dc6db99f034bcb7b.iix)
There is no vacant space in bundle layout:
![](5ffa873a97790650afb952800153afb4.iix)
See report section for this calculation when compute is checked and flow verification need to be performed:
![](affa0bf247f9c250e3378d53636d43c2.iix)