For ASME ND 2007 Eq. 10a requires that Mc to be range of moments based on loading T1, T2 and T3 …. In the pre-verification does not show if range moments (amb T1,amb T2…T1 toT2 …) are considered for the analysis. Is this range shall be prepared by the uer's ? or to be prepared by the user's - Tools/Stress Summary for eq. 10a: cond1-zero mom., cond2-T1, cond2 T2, cond3 T3 for the range of moments to be considered in the analysis.
Correct ranging only occurs in the Full Verification and requires the Stress Summary.
The results from Pre Verification are essentially ranged with zero!
ASME BPV-III-1-ND, AutoPIPE Nuclear Piping Code FAQ