BENTLEY Systems, Inc.
1600 Riviera Ave., Suite 300
Walnut Creek, California 94596-7377
December 1, 2014
AutoPIPE V8i SELECTseries 5 Maintenance Release 1 (Version 09.06.01.11) - Acceptance Test Set Notes
Notes for automated validation runs:
1. The printer configuration for the "number of lines per page" must be set to sixty-three (63).
2. Below given instructions/comments should be considered before executing the test runs:
a. AutoPIPE must be installed before installing the ATS.
b. Correct AutoPIPE edition should be selected before execution of the ATS.
c. In order to execute the ATS for a different AutoPIPE edition, ATS application must be closed and restarted.
d. Before executing the ATS, copy all the models and their dependent files (as mentioned in 'ap_ats.pdf') to a separate location on your machine.
e. For each AutoPIPE edition use a clean set of models by copying back from the location where they were previously saved, as mentioned above.
If you have any questions as to the acceptability of the contents of the ERROR.LOG file for QA validation purpose, please call Technical Support.