Improvements
- Added support to open Infrastructure Cloud projects in 4D Pro UI
- Renamed SYNCHRO Control to Infrastructure cloud projects
- List of Open Infrastructure cloud projects is now populated 2-5 times faster
- Added auto-select first project in Open Infrastructure Cloud (previously Control Project) dialog
- The "First day of week" setting can now be applied to Task and Resource usage spreadsheets
- Added support to accept hours for date range and look-ahead task filter
Library and integration updates
- Updated connection client 24.01.01.12
- Upgraded to HOOPS Visualize (3DF) 29.30 and HOOPS Exchange/Publish 2024.7
- 3D Interoperability updates: SketchUp and DWG: now upgraded with 2024 SDK
- Upgraded iTwinjs to 4.10
- Added support for ProjectWise Explorer (PWE) version 23.06.03.12 for integration
- Navisworks plugin:
-
- Added option to skip user field conversions. By default, the option "Convert user field values to metric system" is checked and will convert the values to meters. When unchecked, user field values will be exported in the original unit.
- Added option to choose which user fields to export like Revit plugin
- Added tooltips to explain when the "Explode objects" option is not in effect
Bugs squashed
- Asta: Importing Asta schedule with German abbreviation "kt" in the Duration column results in invalid durations
- Warning message about projectId being different when synchronising from P6 XML is still not displayed in some occurrences
- Batch load/unload 3D objects by multiple filters
- Fixed the issue when sort does not work correctly for the Visual column (in the Resources table, etc.)
- Fixed the issue when 3D Filter by Task with Ignore timeline does not work as expected
- .sp file size is big even after deleting all data from it: residual texture and image counters are added.
- Not all selected resources are deleted when deleting them in the Custom view in a specific project
- Infinite loading after importing Excel file to a specific sp file
- Results in Recalculate Task Progress are incorrect in some specific cases
- Some objects are not displayed in the Iray render mode in some specific cases: when Task filters are applied, and resource groups are assigned to tasks
- Crashes when applying 3D filters/viewpoints for multiple 3D windows in the specific .sp
- Crashes when synchronizing from specific MS Project XML
- Certain user fields are missing in .dgn file imported to 4D Pro
- Specific MS Project XML synchronization breaks task tree structure
- Fixed UX issue that closing one of the undocked 3D windows would close all windows
- Working with 4D cloud collaboration projects:
- Improve anomaly handling during open Control projects (now Infrastructure cloud)
- Backend cloud db improvements on large transactions, rejected transactions, incorrect transactions, and increasing max resource ID length
- Sync to iModel fails when converting geometry
- Enhanced processing time when user tries to delete objects while working on a 4D cloud collaboration project
- Fixed issues when using both Modeler and 4D Pro:
- After slicing specific 3D elements in Modeler, its geometry is distorted in 4D Pro
- Some objects sliced in Modeler do not appear in 4D Pro
- User fields and properties:
- Not all 3D user fields are visible in Pro compared to Control and Modeler
- Missing user fields in 4D Pro for some 3D objects
and more...