If you have existing cloud-hosted 4D SYNCHRO Control projects, see the detailed instructions on upgrading cloud-hosted projects from 2021 (v6.4) to 2024 (v6.5)
If you are starting your first cloud-hosted SYNCHRO Control project, see Collaborating on a cloud-hosted 4D project.
Click the links below to download the latest version or visit Software Downloads in the Bentley CONNECT Center.
![]() |
![]() |
![]() |
![]() |
| SYNCHRO 4D Pro | SYNCHRO Scheduler | SYNCHRO Open Viewer | SYNCHRO Plugins |
|
| 1. |
Reduced performance issues when Windows is under a scan - in previous versions, programs like antivirus software might cause slowness while users were working on Control projects. Fixes are now in place to prevent noticeable slowness. |
| 2. |
Improvements on textures and other materials conversions – In some cases textures and 3D entity colors are now converted properly between Control projects and 4D Pro. |
| 3. |
Continue to improve near real-time collaboration experience –
|
| 1. |
Upgraded plugins to support Revit 2025 and Navisworks Manage/Simulate 2025. |
| 2. |
Upgraded MicroStation plugin to support MicroStation CONNECT Edition 2024. |
| 3. |
3D Interoperability updates -
|
| 4. |
Replaced Oracle's Java Runtime Environment with OpenJDK. |
| 5. |
Introduced new unit: Diameter Inch. |
| 6. |
Drastically improved performance of the User Fields dialog. |
| 7. |
Asta PowerProject improvement - Bar name from Asta is now imported as a Task user field for improved interoperability; and separate from Task Names. |
| 1. | Updated Help documentation. |
| 2. | Updated distributed version of Bentley Connection Client. |
| 3. | Decreased memory usage for very large projects. |
| 4. | Introduced extra option for alternative IFC import (geometry only). |
| 5. | Updated EULA. |
| 6. | Improved Portuguese translations. |
| 7. | P6 import assigns unique Code Value names within the parent values. |
| 8. | Increased resource identifier limit from 20 to 40 characters. |
| 9. | Security related 3rd party software upgrades. |
| • | Some objects are dislocated and tilted after export to FBX |
| • | Synchronize from Microsoft Project is unsuccessful |
| • | The excel report exported from 4D pro is exporting incomplete data within a cell |
| • | Export to MS project failure |
| • | Export to Iray Error on specific single model |
| • | Transform Manipulator doesn't stay with object when Edit as Assigned |
| • | Specific model view (cranes) is distorted in Iray |
| • | Rejected transaction P6 XML import |
| Error synchronizing activity codes from Asta | |
| • | Assigned resource groups are not displayed after synchronization |
| • | 3D Resources count is wrong at WBS level in Excel export |
| • | Object imported by user is unchecked by default for other users in Control project |
| • | Powerproject (Asta) to include Progress columns 'Percent complete' and 'Overall percent complete'. |
| • | 4D Pro crashes importing specific MS Project XML |
| • | Tasks are created in different order than selected resources order |
| • | Shared includes are deleted too early, orphaning other references |
| • | Mesh with material imports white and inconsistent results |
| • | Grey zone is displayed in 3D view with both Static model and double precision rendering disabled |