| Application | PLAXIS 3D |
| Version | PLAXIS 3D |
| Date created | 18 April 2017 |
| Date modified | 18 April 2017 |
This movie shows the difference for the tunnel excavation in staged construction when using the default continuous propagation of the tunnel face versus a fixed tunnel face, through the Tunnel designer's Sequencing mode.