Is there a way to include the cut off and toe levels in a pile schedule? I can not see a column in the schedule that can give this information. For example the slab schedule has a column for "elevation bottom of slab" and "elevation top of slab" is there anything similar for piles?
OpenBuildings | Speedikon | Forum - Pile Schedule - Cut off and Toe Level